I had to make a reducer because the kit came with a 98mm motor mount and I will be using a 76mm Loki motor (pictured)
Durning the cold weather I messed around with the recovery gear. Here is the 56" chute (blue)that will be attached to the nose cone and deployment bag (green and yellow) The 15' recovery chute will be attached to the 30' shock cord on the right.
The other end of the shock cord with protector.
This is the drouge end. A 5' chute with 60' of schock cord attached to the fin can
An over all shot.
Ok, now the messy stuff. This will be the first time I had to smooth the airframe with filler. I used West System with 410 filler. This batch was too thin and I layed it on too thick. Once cured it took a couple of days to get it back to the right diameter.